This Is My First TearDrop Build Project
(11/1/10 - 3/11/11)
     
     
     
     
     
     
     
     
Start of 5 x10 frame
2000# Axle
Frame Ready
Sealing the floor
Side wall basic framing
Box on for licensing
Box on for licensing
Installing the flooring
Sealing the exterior walls
Framing the front interior wall
Galley wall
Framing the cabin back wall
Painting the exterior